0
Skip to Content
M+A Architecture
ABOUT
Who we are
News
PEOPLE
SERVICES
PROJECTS
CAREERS
CONTACT
M+A Architecture
ABOUT
Who we are
News
PEOPLE
SERVICES
PROJECTS
CAREERS
CONTACT
Folder: ABOUT
Back
Who we are
News
PEOPLE
SERVICES
PROJECTS
CAREERS
CONTACT
Projects Electrical Infrastructure Upgrade | UCSF Moffitt Long Hospital
Sequence+01.00_00_12_15.Still002.jpg Image 1 of
Sequence+01.00_00_12_15.Still002.jpg
Sequence+01.00_00_12_15.Still002.jpg

Electrical Infrastructure Upgrade | UCSF Moffitt Long Hospital

$0.00

M+A provided architectural design, and project management services associated with the construction of a new electrical closet on the ground floor adjacent to an existing rated plaster tunnel condition. We approach all projects with a thorough and thoughtful approach. We anticipated possible issues arising from the age of the facility. Through our approach, we were able to anticipate and mitigate impacts on building conditions, operations, systems, and users while preparing our scope.

Client: UCSF Health
Project Size: 250 square feet
Completed: 2023
Permit Approval process: HCAI

Quantity:
Add To Cart

M+A provided architectural design, and project management services associated with the construction of a new electrical closet on the ground floor adjacent to an existing rated plaster tunnel condition. We approach all projects with a thorough and thoughtful approach. We anticipated possible issues arising from the age of the facility. Through our approach, we were able to anticipate and mitigate impacts on building conditions, operations, systems, and users while preparing our scope.

Client: UCSF Health
Project Size: 250 square feet
Completed: 2023
Permit Approval process: HCAI

M+A provided architectural design, and project management services associated with the construction of a new electrical closet on the ground floor adjacent to an existing rated plaster tunnel condition. We approach all projects with a thorough and thoughtful approach. We anticipated possible issues arising from the age of the facility. Through our approach, we were able to anticipate and mitigate impacts on building conditions, operations, systems, and users while preparing our scope.

Client: UCSF Health
Project Size: 250 square feet
Completed: 2023
Permit Approval process: HCAI

View fullsize Existing Closet
Existing Closet
View fullsize Existing Plaster Ceiling Tunnel Hall
Existing Plaster Ceiling Tunnel Hall
View fullsize Above Ceiling Verification of Perimeter Walls and Ceiling Construction
Above Ceiling Verification of Perimeter Walls and Ceiling Construction
View fullsize 2117+UCSF+EE2.jpg
View fullsize clg.jpg

M+A ARCHITECTURE

About
People
Services
Projects
Careers
Contact

© 2023 All Rights Reserved